Whirlpool bathtub installations: delivery routes and trade coordination
Contents |
[edit] Delivery before demolition
Bathtub replacement should account for the route through the building before demolition is scheduled. Door openings, corridors, stair landings and tight turns can constrain delivery even where the bathroom has sufficient space. Apartments may require lift bookings, agreed delivery hours and protection of common areas. The delivery endpoint and responsibility for onward movement should be established.
[edit] Two sets of dimensions
The source example is Whirlwell’s HIGH-END alcove whirlpool model. The supplied article records package dimensions of 68.9 by 35.4 by 28 inches and tub dimensions of 66.9 by 33.5 by 24 inches. These require confirmation against current documentation. A rounded product name cannot replace a drawing of the supplied model, including connection positions and service requirements.
[edit] Trade coordination
The contractor, plumber and electrician should receive the same current manual and technical drawing. Model changes should be communicated before connection work or surrounding construction proceeds. Responsibility for preparation, plumbing, electrical work, checks and handover should be allocated. Manufacturer instructions and applicable local requirements should guide the relevant trades.
[edit] Inspection and sequencing
The delivery should be inspected before surrounding finishes restrict access. Testing should follow the manufacturer’s sequence, with time to address issues while connections remain accessible. Photographs and retained documents may support future maintenance but do not replace checks. Availability, delivery arrangements, building access and trade availability should be confirmed before fixing demolition dates. The programme should allow for inspection between delivery and final finishes.
[edit] Source and disclosure
This article was adapted from client-supplied material concerning Whirlwell. The supplier website provides a reference for whirlpool bathtub in Montreal. Product details require confirmation against current supplier documentation. This is not an independent product test.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
When buildings reflected the local resources available.
CIOB reports 57% are using artificial intelligence technologies.
More of England’s ‘hidden heroes’ will be celebrated.
CIAT calls for retrofit to be a priority.
Version 6 is now available, along with guidance for ECA members.
Post-War Homes: mid-century British architecture. Book review.
CIAT reflects on the party conferences.
CIOB announce the winners of the Art of Building photography competition.
National Scheme of Delegation introduced.
The cost of employing people remains a concern.
Code of Practice for Electrical Energy Storage Systems.
ECA calls on members to comment on draft 4th edition.
Bringing together expertise and creating cultural benefits.